Concept design — Lattice and Northwind Freight are both invented. Designed by Coding Shields to show a customer story specific enough to be believed.
Lattice

Customer story · Logistics · 340 employees

Northwind Freight stopped rebuilding the same report every Monday

Four analysts spent the first day of every week assembling a load-utilisation report by hand. Eleven months in, that report builds itself — and two of those analysts now do work that did not exist before.

31 hrs of analyst time returned each week Measured by Northwind's own time-tracking, comparing Q4 2024 to Q4 2025.
4 → 0 people needed to produce the Monday report It now runs at 04:00 and is read before anyone arrives.
9 days from contract to the first report running in production Slower than our median. The reason is in the story below.
Company
Northwind Freight
Sector
Regional freight and haulage
Team using Lattice
Operations analytics, 6 people
Customer since
March 2025

The Monday problem

Northwind runs four hundred and twelve vehicles out of nine depots. Every Monday morning, the operations team needed one number per depot: what proportion of available capacity actually moved last week, broken down by lane and by customer contract.

That number lived in four places. The telematics platform knew where the trucks went. The TMS knew what was booked. The finance system knew what was billed. And a spreadsheet maintained by one person since 2019 knew which of the lane codes were real and which were historical aliases nobody had cleaned up.

Producing one report took four analysts most of a day, and by the time it was circulated on Monday afternoon, the decisions it was meant to inform had already been made on instinct that morning.

“The report was always right and always late. We were paying four people to produce a very accurate description of a decision we had already taken.”

Aidan Whelan, Head of Operations Analytics

What we actually did

The interesting work was not the pipeline. Connecting the three systems took two days, and most of that was waiting on credentials. The interesting work was the spreadsheet.

Six years of lane aliases had accumulated in it, with no documented rule for which mapped to which. Nobody at Northwind was willing to declare it authoritative, and nobody was willing to throw it away either — so for the first week the project was not a data project at all. It was two people, a screen share, and a list of eleven hundred lane codes.

We built the mapping into a Lattice dataset with the ownership attached: every alias now has a named owner and a date it was last confirmed. That is why the first report took nine days instead of our usual three. It is also the only reason the report has not broken since.

BeforeAfter
Four analysts, most of MondayRuns at 04:00, unattended
Circulated Monday afternoonIn inboxes before 07:00
Lane mapping in one person's spreadsheetOwned dataset, 1,100 codes, dated
Depot managers disputed the numbers monthlyDisputes now resolve in the audit trail

What changed downstream

The time saving is the headline, and it is the least interesting part. What Aidan describes as the real change is that the report became boring.

When a number is produced by hand and arrives late, every disagreement about it becomes a disagreement about the process. When it arrives before anyone is in the building and carries a link to how it was calculated, the argument moves to what to do about the number — which is the argument the business actually wanted to have.

Two of the four analysts moved onto lane-profitability modelling, which Northwind had wanted to do since 2022 and had never had the hours for.

“Nobody has thanked me for the Monday report in a year. That is the point. It stopped being a thing anyone has to think about.”

Aidan Whelan, Head of Operations Analytics

Where this was harder than we expected

Two things did not go smoothly, and leaving them out would make this story less useful to the next person reading it.

The telematics connector was not ready. We had it listed as available; in practice it handled one API version and Northwind was on another. Their team wrote a shim for the first six weeks while we built it properly. That was our problem, and they carried it.

Depot managers did not trust it for a quarter. Three of the nine kept producing their own version alongside for thirteen weeks. We think that was reasonable of them, and we would plan for it next time rather than treating it as resistance.

What Northwind runs
  • Lattice Team, 6 seats
  • Snowflake
  • Samsara telematics
  • Custom TMS
  • Sage Intacct finance
  • Scheduled exports to Slack

Your Monday report is probably not about freight

But if four people spend a day producing something everybody has already decided without, the shape of the problem is the same. We will tell you on a call whether it is one we can actually help with.